— Bill Gates"This is such a cool book.
The range of Jono's knowledge is astounding, and so is his ability to digest complex ideas into deceptively simple drawings.
You'll learn something on every page—and be entertained too."
Explaining the world one sketch at a time
Sketchplanations in a book! And
news flash now an eBook too! In this 288-page collection, Jono Hey collects together over 130 inspiring, funny and relatable sketches about life. Combining existing and new topics, Big Ideas Little Pictures is a perfect gift of the wisdom and joy of Sketchplanations. Pop it on the table and start having great conversations about ideas.Order an exclusive signed copy
from my friends at South Kensington Books in London
Or order from your local bookshop because we 💙 them.
Notwithstanding, I earn from qualifying purchases through the Amazon Associates program if you use the Amazon links on this site, which helps me out if you are planning to buy from Amazon.
10 sections, 130+ ideas
Big Ideas Little Pictures brings together over 130 sketches across science, psychology, nature, technology, and everyday life. Here's a glimpse of what you'll find inside:
Sections of the book with a few sample sketches for each.
Including: The Coastline Paradox, Autumn Leaves, The Golden Ratio, The Moon Illusion
Including: The Swiss Cheese Model, Microadventures, The Three-Day Effect, Sleep Basics
Including: Schadenfreude, Emotional Hot Potato, Tsundoku, Yak shaving
Including: The Road to Success, Motivation Doesn't Last, 9,000 shots, Sleeping with a Mosquito
Including: You Get What You Measure, The Paradox of Choice, The Spotlight Effect, Chesterton's Fence
Including: Atmospheric Perspective, Phases of the Moon, Know Your Clouds, The Potato Radius
Including: The Traveling Salesman Problem, Starting a Company, The Trust Equation, The Long Nose of Innovation
Including: Thesis, Antithesis, Synthesis, Solvitur Ambulando, The BS Asymmetry Principle, The 20/40/60 Rule
Including: Solar System Sizes, The Overview Effect, The Continental Axis Hypothesis, 1.5 Billion Heartbeats
Including: How to Win at Monopoly, Skip Rocks Like a Pro, The 60-30-10 Color Rule, The Awkwardness Vortex
…and many more.
A peek inside. Click to zoom in.
"This is such a cool book. The range of Jono's knowledge is astounding, and so is his ability to digest complex ideas into deceptively simple drawings. You'll learn something on every page—and be entertained too."
As the world becomes more complex and fraught, the more we need clear and honest pictures to show us a better way. In his marvellous book, Big Ideas, Little Pictures, Jono Hey gives us the pictures we need.
Whether exploring the size of the universe, unpacking the paradox of choice, or illuminating the pure joy of the Golden Ratio, Jono's brilliant sketches make everything make more sense.
I can't think of a better gift for my mind, and yours.
"Big Ideas, Little Pictures is a magical collection of ideas, concepts, and wisdom—some that I've wondered about and others I've never thought about before—presented in a clear visual way that makes Jono's sketchplanations a joy to read, reference, and share. It's a fantastic book!"
"I'm an enormous fan of the wonderful way Jono's sketches bring scientific insights to life for a wide audience."
"Brilliant! It distills a variety of complex and profound ideas into simple to understand and beautifully drawn sketches."
"Jono Hey's Big Ideas Little Pictures is the kind of book that I want to devour all at once, with his brilliantly efficient illustrations breaking down complex ideas—but that I make myself ration to a few pages per day, to give myself time to absorb everything. Either way, it's the best bet I have to make myself seem more interesting as a dinner party guest."
"Jono's superpower is the ability to break down complex concepts into digestible, visually appealing explanations."
"I've loved following Sketchplanations for years. And finally, Jono has brought it all together in this wonderful book. Keep a copy in your home and show it to everyone who comes over."
"Jono's delightful book is a fantastic blend of text and visuals, making the topics easy to understand and remember. I found myself eager to turn each page, learning things I had never known before. I love this book and recommend it to anyone looking to enrich their knowledge at super speed with some creativity and fun."
"I love this book. It will delight adults, fascinate children and help us all to grasp important ideas.
Want to understand the four horsemen of relationship apocalypse? Or different types of phishing? Or the ten essentials for wilderness safety? Jono Hey's explanations are brief and clear – but it's his pictures that stick in your head. Every time you turn over a page, there's something new. I can't wait to try out the instructions for skipping rocks like a pro and taking better photographs—and I'll certainly take up the Dracula sneeze.
I meant to read it slowly, a few pages at a time, but it's such fun that I kept thinking, Just one more picture and finished it in one sitting. I'm looking forward to re-reading it very soon."
"Big Ideas, Little Pictures by Jono Hey is a beautiful and powerful book at the same time. On each page, Jono visualises a complex concept into a clear, engaging little drawing. His sketches don't just simplify ideas, they bring them to life and make them understandable at a glance.
This large collection of concepts, scientific findings and interesting frameworks is delightful and a real testament to the power of communicating through simple visuals. This body of work is even more impressive as it was created by Jono over years of drawing one concept per week.
As a fellow visual thinker I'm in love with this wonderful book. It's a joy to dive in at any page, to get drawn in by the pictures and to learn a new fact with every turn of the page."
"I resent our bedroom looking so messy in the tsundoku sketch."
Please contact me at jono.hey@gmail.com and let me know where you are. It helps us get distribution in the right places first.
Yes! As of May 2025 there's now an eBook of Big Ideas Little Pictures.
It's great for quick reference, easier to carry on your commute or a flight, and a decent amount cheaper. It's packed with nearly 150 bite-sized sketches—perfect for dipping in when you need an idea, a shift in perspective, or a smile.
You can buy it on the store links above, or find it on B&N, Apple Books, Kobo, and others.
Yes. Please use images in the basic media kit. Let me know if it's missing something.
Not yet. Do let me know if you'd like it in another language—it always helps to gauge demand.
The ISBN-13 is 978-1956403572
ISBN-10 is 1956403574
The picture is my own version of Hokusai's remarkable The Great Wave off Kanagawa or just the Great Wave. I once saw the real thing at the British Museum in London. It's small, but few pictures captivate the way it does. Hokusai's wave evolved a lot throughout his life.
I'm at: jono.hey@gmail.com
I started making sketchplanations in 2013 by sketching them in actual books. While putting the sketches online has helped them reach so many more people there's something about browsing through the sketches in a book, phones and laptops away, that makes it the best way to experience it.
Which sketches to include was a challenge. I'm really happy that I've selected sketches that will teach you a new thing or two about the world, make you think, inspire you and make you smile. In the process, I added a host of sketches for topics I'd always wanted to cover ranging from How to Win at Monopoly to the Basics of a Good Night's Sleep.